Let's see if i can pull this off: (post effort comment - only took 90mins to move this behemoth)
2000 - 2026 and counting....
NOV 7 2009:
As some of you know - my 9month resto of my 67 has stretched into a 9 year extravaganza of waiting for the confluence of time and money.
9 years ago I had the body blasted and prepped for paint.
8 years ago I put the thing on the rotisserie and added torque boxes and sub frame connectors.
5 years ago I bought the CA/TCP Power Rack and Coil Overs.
Then things stalled.
Earlier this year EVM decided to cease operations. Hearing that they had 2 watts/3link kits in powder coating, Nick helped me acquire one of their last units. This got me moving again.
In this thread, Ill post the various stages of the job in separate posts. (easier reading)
The Start:
https://www.nenny.com/public/emAlbum/albums/2000-mustang disassembly/day1-05.jpg
2000 - 2026 and counting....
NOV 7 2009:
As some of you know - my 9month resto of my 67 has stretched into a 9 year extravaganza of waiting for the confluence of time and money.
9 years ago I had the body blasted and prepped for paint.
8 years ago I put the thing on the rotisserie and added torque boxes and sub frame connectors.
5 years ago I bought the CA/TCP Power Rack and Coil Overs.
Then things stalled.
Earlier this year EVM decided to cease operations. Hearing that they had 2 watts/3link kits in powder coating, Nick helped me acquire one of their last units. This got me moving again.
In this thread, Ill post the various stages of the job in separate posts. (easier reading)
The Start:
https://www.nenny.com/public/emAlbum/albums/2000-mustang disassembly/day1-05.jpg
Last edited:


















































