Knocking out my punch list the last two weeks.
Upgraded headlight with relays and 12 gauge wiring throughout.
Deleted starter solenoid in favor of relay.
3G alternator wiring mostly complete. Waiting for alternator. UPS dicked me for this weekend. Was supposed to be here today. Monday is revised date.
Mounted A/C compressor. Will need to be adjusted when it's ready for the belt.
Mounted condenser, dryer and binary switch.
Mounted and wired Ford contour fan assembly.
Mounted Borgeson P/S pump (Saginaw)
Put front end back on car.
Carpeted trunk.
New rear spoiler.
I had a friend take care of a little fiberglass work on the evap box. He told me by text earlier today that it was ready so over the weekend I'll go through it and the rest of the inside part cleaning and repairing what needs repaired, replace vacuum motors, evap, heater core, vacuum hoses, seals, etc. Then reinstall it.
I also have a Kenwood KNW1005 front speaker to install, rewire speakers and remove 5 1/2 rounds from quarter trim and install 6x9s.
Then I'll take it to work so I can use the hoist to put the Borgesen box in, Plumb the heater and A/C. Then It will be time to clean it all back up for Beaumont.